Kyanite Pro
iOS app by Mike Haynes. Utilities · Mike Haynes
- Store rating
- 5 / 5
- Store rating count
- 1
- Download price
- Free to download
- In-app purchases
- Unknown
- Version
- 1.2.2
- Listing last refreshed
- 2026-09-11
View the original store listing
Store description excerpt
A professional calculation and reference tool for the people who run the well: drilling and mud engineers, solids control hands, cementers, directional drillers and MWD hands. The calculators work completely offline. No ads and no tracking, and no account is needed to use them. You only sign in if you want to share records with your crew. FREE TO START The scientific calculator, field notes, reference charts, volume tables and the hitch calendar are free, along with the full calculator catalog so you can see what you are paying for. KYANITE PRO Unlocks the 120+ field calculators, kill sheets, cement job sheets, LCM build sheets, location volumes and chemical inventory. Start with a 3-day free trial, then $3.99 per month or $19.99 per year. It all keeps working with no signal. SHARE WITH YOUR CREW Keep one set of figures in front of everybody on location. Share tank gauge readings, chemical inventory, notes, LCM build sheets, kill sheets and cement jobs with the hands you work with, and every phone stays in step. Anything you enter with no signal goes up as soon as you have coverage, and your own records stay private until you choose to share them. 120+ CALCULATORS Drilling engineering: capacities, volumes, string displacement, pump output and strokes, circulation times, hydrostatic, gradient, EMW, ECD, MAASP, lag time and ROP. Drilling fluids: mud weight conversions, oil/water ratio, weighted mixing, barite and hematite addition, dilution, PV, YP, gel strength, API fluid loss, retort solids and alkalinity. Solids control: solids percentage, low and high gravity solids, dilution and discard volume, screen mesh, centrifuge and hydrocyclone. Cementing: slurry yield and density, mix water, additives by percent BWOC, sacks, annular volume with hole excess, top of cement, balanced plug, displacement and strokes. Directional and MWD: minimum curvature, dogleg severity, interpolation, closure and vertical section, build and tangent sections, projections ahead, slide footage and toolface. Well control: formation pressure from SIDPP, kill mud weight, initial and final circulating pressure, the step-down schedule, maximum allowable mud weight from a leak-off test, MAASP, influx height and gas expansion. KILL SHEET A full IADC-style vertical well kill sheet you fill in before you need it. Keep the pre-recorded half current on a quiet tour; if the well is shut in, enter SIDPP, SICP and pit gain and the sheet works the kill with a full step-down schedule. CEMENT JOB SHEET Lay out a primary job end to end: capacities, coverage, barrels, sacks and mix water, the annulus drawn to scale, and a pump schedule with cumulative strokes. Casing presets from 20 to 4-1/2 inch. LCM BUILD SHEET Design a lost circulation pill product by product from your own inventory. Pounds, sacks, concentration and cost per barrel, a stock check against what is on hand, and one tap to record it as used. CHEMICAL INVENTORY A real daily ledger: previous, received, used, transferred
Review coverage
AppRill has captured 0 reviews for this app. This is a collected sample, separate from the store rating count. Latest review capture: Not captured yet.
Recent captured chart positions
No chart positions have been captured for this app yet.
Chart position, rating count and review coverage do not establish downloads, revenue or profit. Understand the differences.