DonePacket: Change Orders
Android app by Tumar Labs. Business · Tumar Labs
- Store rating
- Unknown
- Store rating count
- Unknown
- Download price
- Free to download
- In-app purchases
- Listed by the store
- Version
- 1.0.5
- Listing last refreshed
- 2026-09-11
View the original store listing
Store description excerpt
Keep every approval for a small contracting job in one clear PDF record. DonePacket is a job documentation app for handymen, remodelers, repair pros and independent contractors. Capture estimate approval before work starts, document extra work with signed change orders, attach jobsite photos, and record the customer's final sign-off. ONE JOB. ONE PACKET. Instead of searching through texts, paper notes and your camera roll, keep the original estimate, every approved change, photos and completion sign-off together. ESTIMATE APPROVAL • Add customer and job details • Build line-item labor, material and miscellaneous costs • Record scope, exclusions, payment terms and signer details • Capture an on-device signature with a timestamp SIGNED CHANGE ORDERS • Describe added or removed work • Record price and schedule impact • Attach supporting photos • Get customer approval before continuing FINAL JOB SIGN-OFF • Summarize completed work • Record completion or exceptions • Add the remaining balance • Capture the customer's final signature JOBSITE PHOTOS Attach before, during and after photos to the job record so the work and approvals stay connected. PDF JOB RECORD Preview, export and share one organized PDF containing the estimate, change approvals, signatures, final sign-off and photo evidence. Use it for your records or as supporting documentation before invoicing. BUILT FOR SMALL CONTRACTORS DonePacket is designed for solo handymen, remodelers and small residential repair businesses. It focuses on approvals and job records—not scheduling, dispatch, accounting or a complicated CRM. WORKS OFFLINE Create jobs, capture signatures and generate PDFs without a connection. No DonePacket account is required. Records are saved locally on your device. FREE AND PRO Free users can create up to three first-time signed packets per calendar month. DonePacket Pro adds unlimited packets, signed change approvals, final sign-off, business branding, photo-rich PDFs and watermark-free records. Pro requires an auto-renewable in-app subscription. DonePacket is a documentation tool. It does not provide legal, tax, insurance or construction compliance advice.
Review coverage
AppRill has captured 0 reviews for this app. This is a collected sample, separate from the store rating count. Latest review capture: Not captured yet.
Recent captured chart positions
No chart positions have been captured for this app yet.
Chart position, rating count and review coverage do not establish downloads, revenue or profit. Understand the differences.